
New TopShim run:

version = topshim 2.4.0
date = 2024-05-23
time = 14:01:35.491
command = topshim 

FINE SHIMMING

Parameters:

probe = Z113652_0298
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 13C
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Iteration  1: FWHM Before= 3.0 Hz, Target= 0.4 Hz, After= 0.3 Hz
Iteration  2: FWHM Before= 0.3 Hz, Target= 0.3 Hz, After= 0.5 Hz
Iteration  3: FWHM Before= 0.5 Hz, Target= 0.4 Hz, After= 0.6 Hz
Iteration  4: FWHM Before= 0.6 Hz, Target= 0.3 Hz, After= 0.4 Hz
Iteration  5: FWHM Before= 0.4 Hz, Target= 0.3 Hz, After= 0.5 Hz
Iteration  6: FWHM Before= 0.5 Hz, Target= 0.3 Hz, After= 0.7 Hz
Iteration  7: FWHM Before= 0.7 Hz, Target= 0.4 Hz, After= 0.4 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.595

shim changes: 
Z	+69
Z2	+6
Z3	+85
Z4	-368
Z5	+222

duration = 1 min 35 sec
completed successfully
finished Thu May 23 14:03:09 2024


========================================================================
